Indonesia Expat
FeaturedNews

Bali Signs Deal for Battery-Powered Electric Tram Linking Airport to Canggu

tram kuta - canggu

The Bali Provincial Government, together with the Badung Regency Government and PT Kereta Api Indonesia (KAI), has officially signed a collaboration agreement on the development of battery-powered electric tram mass transport along the I Gusti Ngurah Rai International Airport–Canggu route.

The project aims to overcome congestion and support tourism. Bali Governor Wayan Koster said that the signing of the agreement, which took place on Tuesday, 1 September, and was attended by the Regent of Badung, the Managing Director of PT KAI, the CEO of Angkasa Pura, and the Badung Regional Secretary, was a follow-up to a proposal from the Indonesian Ministry of National Development Planning and the Bali Provincial Government.

The electric tram is considered to be an increasingly concrete solution to traffic congestion along the I Gusti Ngurah Rai International Airport–Canggu route, which records daily mobility of up to 150,000 people and 80,000 vehicles.

Tourist comfort must be maintained. It is hoped that the existence of the tram will become a new attraction for Bali tourism,” Koster said on Tuesday.

Bali Provincial Government and KAI to Develop Battery-Powered Electric Tram
Bali Provincial Government and KAI to Develop Battery-Powered Electric Tram. Image Source: instagram.com/@iwayanadiarnawa

Furthermore, Koster explained that the tram was specifically designed to be different from conventional trains. It is smaller than a bus, with a width of more than 2 metres, and is quiet and environmentally friendly. As it is battery-powered, it does not require overhead cables. The electric tram is projected to have a travel time of 30 minutes, with departures every 10 minutes. In addition, the system is targeted to transport up to 60,000 passengers per day, or accommodate 40% of regional mobility.

The groundbreaking ceremony is planned to take place in March 2027, with the first line beginning operations in 2028. The entire route to Canggu is expected to be fully completed in 2029.

The battery-powered electric tram was chosen because it was considered more in line with Bali’s characteristics than modes such as Mass Rapid Transit (MRT) or Light Rail Transit (LRT). The battery-powered electric tram is also considered to have lower noise levels than the other alternative modes of transport.

“Transportation development must take into account Bali’s uniqueness, preserve its beauty, support tourism, and not disrupt the lives of the local community,” Koster emphasised.

Related posts

Japan Commits to Upgrading Indonesian Railway

Milafel Dacanay

Bali Governor Koster Firmly Rejects Casino Development in Bali

Indonesia Expat

Bali Government Bans Development of Tourism Facilities on Productive Land

Indonesia Expat

PCR Tests Now Available at Train Stations

Indonesia Expat

Government to Limit Telecommunication Networks in Bali During Nyepi

Indonesia Expat

Bali Government to Implement a Quota System for Foreign Tourists

Indonesia Expat